SPC Training (Statistical Measurement Control) – Measurement Control

Tehnical Training Menu

Contents of training

  • Process analysis, stability and capability
  • Variation and statistical considerations
  • Control charts (control chart) – Statistical elements and functional components
  • Control charts for measurable variables
  • X and R Graphs – calculating control limits
  • Trends and interpretation of charts
  • Statistical calculation of the percentage performed outside the process
  • Charts for one variable
  • Charts for variables using standard deviations of samples
  • Control charts through attributes. “np “, ” c “, ” p” and “u” charts
  • Capability. Calculation of Cp , Cpk , Cpu , Cpl indices
  • Expected outcomes

    ○ Analysis and interpretation of capability chart based on specification limits
    ○ Learning and understanding of basic statistical concepts used in process analysis
    ○ Practical learning of the mode of calculation of control limits and methodology to achieve control charts
    ○ Learning interpreting control charts
    ○ Learning capability computing mode
    ○ Learning interpreting Cp, Cpk, Cpu, Cpl indices

    Duration of training : 2 days, from 8:00 a.m. to 5:00 p.m., with a break of 15 minutes after 1h 45 ‘ and 1 hour lunch break for lunch.

This post is also available in: Romanian